Customization: | Available |
---|---|
Warranty: | 1year |
Type: | Jacquard |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Q1.Can you provide OEM service?
we can provide OEM service. It will depend on your requests,your logo will be customized on our products.
Q2.How many days about delivery time?
15-20 days after TT deposit.
Q3.What is the packing?
General machines are with vacuum packing. Particular machine are packing with vacuum and wooden case. Container loads as per the machine size.
Q4. What information may contain in my inquiry?
Your request your machine's embroidery area /needle number /head number/head interval/other function need.
Q5. Do you test all your goods before delivery?
Yes, we have 100% test before delivery
Q6.How to insatll and use the embroidery machine?
We have the English teaching manual and videos;The videos about every step of machine Disassembly, assembly, operation.
Q7: How do you make our business long-term and good relationship?
1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them.
(1) use a brush to clean the rotating shuttle, shuttle shell and shuttle core of the hooking mechanism. Do not use sharp and hard tools to remove sundries and threads.
(2) remove sundries and thread ends at the height of wire rod, wire channel and felt;
(3) four pairs of guide rail (type 615) in front and rear of Y-axis feeding mechanism are on the same plane;
(4) two X-axis feeding mechanism guide rails are on the same plane;
(5) wire clip mechanism, wire clip, rotating wheel, wire pick, spring and wire channel are often cleaned up;
(6) cleaning sundries on the surface of work surface;
(7) the surface of the computer and the exhaust fan are often rubbed and the back cover is opened;
(8) power box, drive box surface and ventilation are often as above.